Nigel Messer
Water Design & Gate Readiness Manager
Greater Brisbane Area
What the role is
Water. Planning, design and the measuring of water for the scheme. The title sits inside the project. It does not hold the river.
Area
Water · On the chart
Senior in this area
No senior in this area on the extract. Hydro has not published the reporting line.
Same area
- Patrick Levings · Water planning and approvals lead
- Matthew Pilkington · Hydrographic Services Lead
Senior and same-area names are inferred from job titles. They are not a published org chart.
- Headline
- Manager, Water Design and Gate Readiness at Queensland Hydro
- Role line LinkedIn showed
- Current: Water Design & Gate Readiness Manager at Queensland Hydro
- Location
- Greater Brisbane Area
- Connection on the scrape
- 2nd
LinkedIn does not publish the rest of the profile. Experience, education and about text are behind the login wall. The fields above are the whole public extract.
Write to them
Tell them to stop Borumba Hydro.
Two steps. First you prove the email is yours. Then the letter goes to [email protected], and you are BCC'd. That address is the company pattern. The mail server accepts every name, so it is not a confirmed personal mailbox.
Public contact
No direct email or phone is published for this person. These are the company lines.
- Borumba: 1800 433 939 · [email protected]
- Media: 0438 204 378 · [email protected]
- General: [email protected]
- Complaints: [email protected]
- 80 Ann Street, Brisbane