Sovereign Kabi Defence of Yabba Creek

What Queensland Hydro is really saying

A Kabi analysis of Queensland Hydro's social media. Fifty Facebook posts about the Borumba pumped hydro project, 24 February to 15 October 2026, from facebook.com/queenslandhydro. Prepared by gilburri fahy. October 2026.

Cover: Post 42, Granite Camp in the proposed upper reservoir area. All Queensland Hydro post text and all comments in the PDF are reproduced verbatim from Facebook.

View the full PDFDownload PDF

Introduction

My name is gilburri fahy. I am a Kabi man, and I stand with the Sovereign Kabi Defence of Yabba Creek. This report is about the waters of my people and about how a government-owned company talks to the public while it works on those waters.

Yabba Creek runs through Kabi country in the Mary Valley, near Imbil. Long before anyone called it Borumba, it was Yabba Creek, and the old records still say so. One of Queensland Hydro's own posts uses a 1959 photo captioned "Yabba Creek Dam Site". For Kabi people this creek is not a project site, a storage asset or a scenic backdrop. It is living water. It carries our stories and our responsibilities. The lungfish, the turtles and the creatures of these waters are kin to us. The bends of this creek are places our old people walked, fought for and protected. When I say "protect these sacred waters", I mean it literally.

Queensland Hydro is pushing the Borumba Pumped Hydro Project onto this creek. Our position is clear: we do not consent, and we oppose it. Questions put on Queensland Hydro's own Facebook page, about sovereignty, about Kabi rights, and about alternatives that would not wound this country, are still waiting for answers.

The report examines the last 50 Facebook posts, from 24 February to 15 October 2026. Each post is in the PDF in full, with a screenshot, the reactions, comments and shares, and every comment that would load. gilburri's own comments are labelled. After each post there is a Kabi analysis: what the post is really doing, what it puts in the spotlight, and what it leaves in the dark.

What is there: waterskiing photos from 1985 and dam-building photos from the 1960s, used to wrap a new project in old memories. Grants for pools, shows and fishing clubs. Job and supplier briefings, pop-up offices, and invitations to "share your views". Works described as minor, interim and exploratory while tracks, creek crossings, bores, a workforce camp and tunnel plans move onto the ground.

What is missing: in 50 posts, Queensland Hydro never once uses the words Kabi, Kabi Kabi, Traditional Owners, First Nations or Aboriginal. Cultural heritage appears exactly once, as a single bullet point in a list of monthly works. Yabba Creek is mentioned mostly as the name of a road for trucks.

And few people are listening. For a page with about 2,300 followers, the typical post gets around 17 reactions and 4 comments. Many posts get no comments or shares at all. Where people do speak, more of them are critical or worried than supportive. Some of the counted comments simply cannot be seen.

The posts are in the PDF, word for word, with links back to Facebook. Let the valley breathe. Protect these sacred waters. #stopborumbahydro

— gilburri fahy, Sovereign Kabi Defence of Yabba Creek

Engagement

About 2,300 followers. Across the 45 posts where engagement was captured, the typical post received 17 reactions, 4 comments and 1 share: about 20 interactions, or 0.87% of followers. The average, pulled up by a few posts, is 40.1 interactions (1.74% of followers).

MeasureTotalAverageMedianHighestLowest
Reactions1,37630.617163 (Post 39)3 (Post 18)
Comments3267.2441 (Post 31)0 (8 posts)
Shares1042.3114 (Post 39)0 (20 posts)
All interactions1,80640.120Top 5 = 40%—

Engagement was not captured for posts 13, 15, 17, 21 and 45, so they are excluded from these calculations. Post 47's date is estimated as early April 2026. Where no share count appeared it is treated as zero. Angry reactions are visible on several posts (including 13, 15, 27 and 31), so not every reaction is approval.

Highest and lowest

PostOpening lineTotal
39 · 14 MayDon't miss out on our local industry briefing sessions!188
27 · 16 JulQueensland's own FKG Group will soon be commencing a range of interim…177
42 · 5 MayHow will we support our workforce during #Borumba's exploratory works130
6 · 17 SepBack in time on #Borumba!111
31 · 2 JulExploratory works are an essential step in delivering major infrastruc…111
38 · 19 MayTimes have changed, but people have been a part of powering Queensland89
40 · 13 MayWe joined Bruce and the crew from Lake Borumba Fish Stocking Assn…83
48 · 2 AprWe've officially kicked off our exploratory works program…79
18 · 17 AugCatch the team at this month's #Kilcoy mobile office!3

What gets the most response is business opportunity, dam nostalgia, and the workforce camp. What gets almost nothing is the material Queensland Hydro presents as engagement: office hours, mobile offices, newsletters and monthly works updates.

By type of post

TypePostsAvg reactions
Works and exploratory-works updates2135.0
Community grants and sponsorship1018.3
Consultation, office hours and pop-ups914.3
Jobs, suppliers and industry453.8
Dam nostalgia / history363.0
Newsletter and website promotion215.0
Safety14.0

Four out of every five posts (40 of 50) are works updates, consultation and pop-up notices, or grants. The posts that invite people to share their views are among the least engaged. Reels did not outperform photos: 13 reels averaged 33.5 total interactions; 37 photo, graphic and link posts averaged 42.3. Posting picked up from one a month in February and March to five to eleven a month from April. Engagement peaked in May and has fallen since. August averaged 1.2 comments per post. More posting has not produced more engagement.

What the comments say

All 234 visible comments and replies were coded by hand. The coding is rough, and it sits next to each comment in the PDF so it can be checked. gilburri's comments are counted separately. They are all critical. None of the 32 findings relies on those comments as evidence.

Comment typeCount
Critical / opposed / concerned43 (24% of public comments)
Supportive of the project22 (12%)
Praise for a sponsored activity10 (6%)
Jobs / business enquiry17 (10%)
Neutral question11 (6%)
Tag, nostalgia, banter or other73 (41%)
Author's own (gilburri)22
Queensland Hydro reply36

Of 176 visible comments from members of the public, 43 (24%) were critical and 22 (12%) supported the project. Including the author's 22 comments, critical voices make up 65 of the 198 non-Queensland Hydro comments. Much of the positive engagement is people asking about jobs or thanking the company for money.

How Queensland Hydro responds

Thread started byThreadsRepliedRate
Critical / opposed / concerned301033%
Jobs / business enquiry13969%
Neutral question10880%
Supportive of the project11327%
Praise for a sponsored activity1000%
Tag, nostalgia, banter or other4936%
Author's own (gilburri)2100%

36 replies, on 17 of the 50 posts. Critical comments were far less likely to get an answer, and when they did the answer was often a pasted statement. None of the author's 21 threads, including formal questions about Kabi sovereignty and rights, received any reply.

32 findings

From the 50 posts and the comments that loaded. Points marked Interpretation are readings of the data, not facts in it. Comment categories are the same manual coding as the statistics above.

  1. 1. The project's real status is only ever explained in replies, never in a post.

    The words "business case" appear 0 times in the 50 posts but in 10 of Queensland Hydro's 36 replies (posts 2, 23, 27 twice, 30, 31 three times, 33, 42). One reply says "Queensland Hydro is currently progressing a revised business case… and remains in the design and assessment phase" (post 2). Meanwhile at least 8 commenters say they have heard it is dead, axed or not funded, including "the project is dead after that" (post 2), "this project had been rightfully Axed" (27), "this project was being abandoned" (31), "It won't be going ahead" (31), "I keep hearing different things" (33) and "Still going ahead with the project?" (30). No post ever states its status to all 2.3K followers.

  2. 2. Cost is never mentioned. The only dollar figure in 50 posts is the $10,000 grant.

    "Cost", "billion", "dollar" and "budget" appear 0 times. The only money in any post is "up to $10,000" for grants (posts 13, 15, 20, 50). Commenters raise money in 11 comments ("Stop wasting our tax dollars", "Giant money pit of doom for Yabba ck.", "More wasted money"). When Scott Reynolds asked "I herd it's costing $17 billion and a 25 plus years project. How can you call economical" (post 31), the reply gave no figure, only "our focus is on delivering a refreshed business case and commercial assessment".

  3. 3. The most-liked comment in the whole dataset is a critical question that was never answered.

    Julie Lee's "Is this Queensland's version of the flawed Snowy 2.0?" (post 31) has 15 reactions, more than any other comment or any Queensland Hydro reply (the best reply has 8). Snowy is raised in 4 comments (posts 2, 27, 31, 48). Queensland Hydro answered none of them.

  4. 4. Critics get more audience support than Queensland Hydro does.

    The 43 critical comments drew 88 reactions (2.05 each). Queensland Hydro's 36 replies drew 32 (0.89 each), and the 22 supportive comments drew 42 (1.91 each). Of the 9 non-Queensland Hydro comments with 6 or more reactions, 6 are critical (Julie Lee 15, Shane Walker 9, and Steve South, Ken Jenkins, Dianne Kewin and Grant Budd at 6 each). Based on the manual comment coding.

  5. 5. Queensland Hydro "liked" 8 comments. All were nostalgia, banter or thanks. None were critical.

    The 8 comments marked "liked by author" are 4 waterskiing memories on post 3, a crane memory on post 6, two sponsorship thank-yous on post 12, and one camp answer on post 17. None of the 43 critical comments was liked.

  6. 6. Nobody who asked when it will start ever got a date.

    The questions include "When will construction start" (post 5), "When do you think the main works will start?" (30), "When is the dam and other major construction pieces going to start" (27) and "When is the actual construction phase of the plant going to start" (42). The replies only describe "phases". Three timing questions got no reply at all. The only forward-looking number in any post is a workforce "peak at around 200 personnel at the start of 2027" (post 42).

  7. 7. Walk-in hours at the Imbil office were cut by two-thirds and labelled "updated times!".

    Post 44 (22 April) announced "We're extending our Imbil Office opening hours!" to Mondays, Tuesdays and Thursdays, 10am–1pm: 9 walk-in hours a week. Post 4 (12 October) made Monday and Tuesday "by appointment" and left Thursday 10am–1pm "as normal", so walk-in time fell to 3 hours a week. The extension got a celebratory headline. The cut got a neutral one. Post 4 got 5 reactions and 0 comments.

  8. 8. By their own dates, was the workforce camp finished before exploratory works were approved?

    Post 42 says: "In October 2025, Queensland Hydro completed the temporary accommodation 'Granite Camp' in the proposed upper reservoir area." Replies on posts 30, 31 and 33 say approval under the Commonwealth EPBC Act to undertake exploratory works was received in December 2025. Post 38 says the camp was "purpose-built to support early works". Interpretation: the camp may have had its own separate approval. The data does not show a breach, but the two-month order of events is worth a public question. This is raised as an open question, not as proof of any breach.

  9. 9. The EIS is presented as only a "maybe", yet the EIS partner is already on site.

    Replies in July say a comprehensive Environmental Impact Statement "would be required" should the project progress beyond the current stage (post 23), and that a separate EIS would be required "if the Project progresses to main works" (post 30). Post 2 (13 October) shows the approvals team on site with "our Environmental Impact Statement (EIS) Delivery Partner, EMM". Interpretation: they are preparing as if main works will go ahead while telling the public it is undecided.

  10. 10. Specific questions get pasted replies that do not answer them.

    Tim Peek asked about "ongoing environmental damage to the Mary River from sediment" (post 27). The 189-word reply never mentions sediment or the Mary River. Grant Budd asked about endangered, critically endangered and protected species (post 23). The reply names no species and no protection measures. Ken Jenkins asked "Is that why you put your offices in Nambour?" (post 29) and was told most opportunities come through contractors. Scott Reynolds' cost question (finding 2) got a "business case" line.

  11. 11. On their own "we're listening" post, the biggest environmental question was ignored.

    Post 23 promises "Listening to community feedback" and "Sharing information openly". It drew 28 comments, the second-highest count, of which 8 of the 22 visible are critical. Dianne Kewin's "So how are you explaining the hectares of pristine scrub that will be lost?" (5 reactions) got no answer. Queensland Hydro's only reply in that thread was a social-media-rules notice aimed at another commenter. Six of the 28 counted comments on this post do not load.

  12. 12. The same people come back asking for the same environmental documents.

    Grant Budd raised environmental concerns on four posts, including "shouldn't any form of environmental impact assessment have be done before you started clearing the land?" (2), "Still waiting for environmental impact surveys to be released" (23), "where are your environmental impact surveys?" (30) and "The damage to the local environment is huge yet somehow is being swept under the carpet" (31). He got the same pasted statement three times (posts 2, 23, 30). Interpretation: the standard answer is not satisfying the people who receive it.

  13. 13. The missing comments cluster on the posts with the most criticism.

    The four posts with the most critical comments (2, 23, 27 and 31, with 7–8 each) account for 46 of about 105 comments that are counted but do not load. Posts 10, 35, 47 and 50 showed comments when first captured, then showed "No comments" when the comments were scraped. Caveat: commenters deleting their own comments, spam filters or Facebook faults can also cause this. The data cannot show who removed them.

  14. 14. "Consultation" appears 0 times in 50 posts. "Community" appears 29 times.

    "Community" is used 29 times across 20 posts. "Listen" and "feedback" each appear once, both in post 23. "Share your views" appears once (post 18), and that post got 3 reactions and 0 comments. The only time Queensland Hydro uses "consultation" is in pasted replies ("following a detailed consultation period", posts 30, 31, 33).

  15. 15. No post names a threatened species, a habitat or a river. The only fish named are stocked sport fish.

    "Species", "habitat", "river" and "Mary River" each appear 0 times in the 50 posts. The only animals named anywhere are "bass, golden and silver perch, used to replenish recreational fishing stock" (post 40). Interpretation: wildlife only appears as a recreational resource, never as something at risk.

  16. 16. Land clearing is never named, even though the works clearly involve it.

    "Clear" appears only in "clearer picture" (posts 1, 9). "Tree" and "vegetation" appear 0 times. The posts still describe "access tracks, temporary creek crossings and portal pad preparation" (27), "construction of new gravel tracks" (43) and "an exploratory tunnel" (31). When Grant Budd wrote "before you started clearing the land" (post 2), the reply did not dispute that clearing had happened. A commenter on post 48 asks "When are the primary clearing jobs starting".

  17. 17. Cultural heritage gets one bullet point in a 9-second reel, and nothing after.

    The only mention of heritage in 50 posts is "Cultural heritage surveys" in a list of April works (post 46, a 9-second reel). No later post reports what was surveyed, found or protected. Post 49 (March), the matching works list, does not include it at all. In all 50 posts the words Kabi, Kabi Kabi, Traditional Owners, First Nations and Aboriginal never appear.

  18. 18. Local-jobs promises come with no numbers, and the jobs question goes unanswered.

    Posts 25 and 29 say Queensland Hydro is "committed to providing opportunities to local suppliers" and "committed to maximising local jobs", but no post gives any figure for local jobs. "Curious how many jimna locals have jobs there?" (post 2) got no reply. To Ken Jenkins, Queensland Hydro said most opportunities come through contractors (post 29), and a commenter concluded "Qld hydro won't be the direct employer" (post 42). The page's best-performing post (39, 188 interactions) is an industry-briefing promo. Interpretation: the most interest the page attracts is in contracts.

  19. 19. Recreation was promised in six words on a nostalgia post. The boating fear on another post was ignored.

    To "hopefully this project doesn't impact on recreational sport on the dam", Queensland Hydro replied "You'll be able to enjoy as per!" (post 3). Corey Dark's worry about "the large todal rise and fall of water" and that "boating will be prohibited which the community does not want at all" (post 8) got no reply. Interpretation: that is an unconditional assurance given before any EIS has been done.

  20. 20. Alternatives raised by the public are never discussed.

    Commenters raise batteries ("Big Batteries cheaper?", post 17), nuclear (posts 23 and 27), raising the existing wall instead (posts 27 and 31) and off-river pumped hydro (post 36). No post or reply engages with any alternative. The reply to Ken Jenkins on post 31 just restates the "two key stages".

  21. 21. A change in who oversees the project was disclosed only in a buried reply. The follow-up was ignored.

    Only in a reply on post 2: "In June 2025, the Queensland Government transferred oversight of Queensland Hydro to Queensland Investment Corporation (QIC)." No post mentions QIC. The follow-up, "Queensland Hydro who are you accountable to......", got no answer.

  22. 22. Other commenters do Queensland Hydro's explaining, including the uncomfortable parts.

    Tony Slattery told a commenter it is "a few years away yet - if it proceeds? There will need to be a big chunk of Federal funding required" (post 27). Shelley Strachan answered the "axed" rumour (27), and Glen Barbieq pointed a job-seeker to the website (42). Queensland Hydro never confirmed or corrected the "if it proceeds" or federal-funding points.

  23. 23. The replies are templated: "Hi [name]… Thanks!", with paragraphs pasted between posts.

    28 of 36 replies open "Hi" and 23 end "Thanks!". The same "two key stages… In December 2025, we received approval under the… EPBC Act" block appears on posts 30, 31 and 33. "Investigation and planning phase…" is word for word on posts 5 and 6. The same long environmental statement appears 4 times (posts 2, 23, 27 and 30). 17 of 36 replies send the person to an external link, and 7 replies were edited after posting. Two "replies" contain no text at all (a GIF or tag on posts 33 and 34).

  24. 24. Engagement events are announced at short notice and get little response.

    The Jimna mobile office was announced on 13 July for 14 July (post 30), and the Kilcoy mobile office on 17 August for 18 August (post 18). The Mary Valley Show stall got 4 days' notice (11) and Kilcoy on 16 June got 5 (35). The seven pop-up and mobile-office posts (8, 11, 18, 26, 30, 35, 47) have a median of 8 reactions, and post 18 got 3. Interpretation: these count as engagement while giving residents very little time to plan.

  25. 25. Outreach leans towards Kilcoy, which a local says is "no where near" the dam.

    Kilcoy is named in 10 posts. There were 4 Kilcoy mobile offices (8, 18, 35, 47) against 1 in Jimna (30). Kilcoy also got the show sponsorship (26) and the Aston Park precinct (12). Corey Dark asked: "Why do you need to be in Kilcoy when the hydro dam is no where near it?" (post 8). Interpretation: goodwill spending looks aimed at a town that may be less affected.

  26. 26. Most posts send people off Facebook.

    34 of 50 posts carry an external link, 32 of them to qldhydro.com.au, plus bit.ly short links on posts 19 and 31. Posts with links have a median of 19 interactions, against 20.5 without. Three posts exist only to push the newsletter or news page (7, 33, 41), and post 7 got 6 reactions and 0 comments. Interpretation: the page is used to push people elsewhere rather than to talk with them.

  27. 27. Content is recycled from month to month.

    There are 5 monthly works reels (16, 28, 36, 46, 49). Posts 46 and 49 are almost word for word. The industry briefing was promoted twice in 6 days with the same bullets (39, 37). The sentence "Since launching, the program has supported more than 25 local groups…" is identical in posts 15 and 20. The borumba-works page is linked 9 times.

  28. 28. The page makes errors: wrong links, typos and broken sentences.

    Post 35 promotes a Kilcoy mobile office on 16 June but links to "industry-briefing-online-tues-16-june-2026". Typos include "#Boruma" (14), "Keep an eye out oversize for loads" (24), "mobilisaton" and "For all the details across to our" (49), "more than 43,000+" (40), "surfaced-based" (48) and "past time" (3). The replies also have "exporatory" and "cleaer" (post 2) and "eligible to apply to apply" (post 20). Posts 12 and 22 are the only ones without #QldHydro. Interpretation: this is hard to square with a well-funded state project.

  29. 29. It is an office-hours page. No weekends. More posts do not mean more engagement.

    All 49 dated posts went up on weekdays. 48 were posted between 07:00 and 17:19, and one at exactly 00:00 (post 8, so scheduled in advance). The longest gaps are 21 days (12 March–2 April) and 19 days twice. Only 3 posts went up between 24 February and 2 April. July was the busiest month with 11 posts, but August's 9 posts averaged just 1.2 comments, the lowest of any month with more than 2 posts.

  30. 30. The questions about where a historic photo came from were ignored.

    On the 1985 waterskiing post (3), Blair Price asked where the photo came from, and commenters argued over who was pictured and who took it. The post credits no photographer, and Queensland Hydro did not answer. Post 6's 1962 photo also has no credit. Marked minor in the report.

  31. 31. The grants program has grown slowly despite constant promotion.

    It went from "more than 20 local groups" (post 45, 13 April) to "more than 25" (posts 15 and 20, August): roughly 5 more groups in 4 months, while grants were promoted in 7 posts. The 6 grants and sponsorship posts with captured engagement averaged 18 reactions, and without post 40 (68 reactions) the average is 8. The report marks this one weak. "More than" hides the exact numbers.

  32. 32. A handful of accounts supply much of the visible praise.

    32 supportive or praise comments come from 22 accounts. One account wrote 5 of them. Another appears on 6 posts with 8 comments and replies, including 3 GIFs. Critical comments come from 29 different accounts. This is a count only. It says nothing about who is behind any account, and no identity claim should be made from it.

Data limits, not findings. Reaction types (Like, Angry, Haha and so on) were not recorded as a full set, so the findings do not claim a count of angry or haha reactions. The screenshots do show angry reactions on several posts, which is why the report says not every reaction is approval. Engagement was not captured for posts 13, 15, 17, 21 and 45. Comment ages are relative, so reply speed cannot be measured reliably. Comment categories are manual coding. Gaps between the comment counter and visible comments can have innocent causes.

Advertising and spend

Every dollar figure below comes from a published source named in the report. The figures use different units and different years. They overlap. They must not be added together.

SupplierWhat the disclosure saysValue
EssenceMediaComPaid-media buying. Agency for Hydro is How.$1,430,000
Fourfold Studio(s)Engagement / placemaking. Borumba engagement support.$494,524
DD Project ConsultingStakeholder Engagement Specialist$429,411
EvexiaStakeholder support, engagement and risk$385,000
DMAC Advisory ServicesBorumba social performance and stakeholder$366,960
BBS CommunicationsStakeholder engagement and communications$293,046
StreemMedia monitoring and media analysis$90,810

A further $759,000 contract with Reflexivity (Voconiq) is left out of the report's total because the disclosure does not say what was bought.

Illustration only. Not a measured cost.

Queensland Hydro does not publish what it spends on Facebook in 2026, so a true cost per like, comment or share cannot be worked out. If the A$49.7K to A$63.8K known to have been paid to Meta in 2024 were set against the 1,806 interactions on these 2026 posts, that would be about $28 to $35 per interaction. The 2024 money paid for 2024 ads, not for these 2026 posts, and most of these posts were not paid ads. It is not the real price of any reaction.

Not a fact. The "$2 million a year on social media" claim.

An insider has said Queensland Hydro's social media budget is about $2 million a year. This is an unverified claim from a source. The documents that would prove it have not been seen. It is not presented as fact. The public record neither confirms it nor rules it out, because Queensland Hydro does not publish a marketing or social media total. The only direct measure of paid social, the Meta Ad Library, shows tens of thousands of dollars, not millions. A whole-of-communications budget near $2 million a year is described in the report as plausible if the source meant agencies, media buying, engagement consultants and an in-house team. Only Queensland Hydro's own records can settle it.

The 50 posts

Newest first, as in the report. Each post in the PDF has the Facebook text, a screenshot, the engagement, the comments that loaded, and a Kabi analysis. This page does not retype all of that. The record of the posts is the PDF.

  1. Post 1 — Thursday 15 October 2026, 11:30
  2. Post 2 — Tuesday 13 October 2026, 13:49
  3. Post 3 — Monday 12 October 2026, 15:55
  4. Post 4 — Monday 12 October 2026, 13:41
  5. Post 5 — Tuesday 6 October 2026, 15:33
  6. Post 6 — Thursday 17 September 2026, 09:14
  7. Post 7 — Monday 14 September 2026, 11:07
  8. Post 8 — Wednesday 9 September 2026, 00:00
  9. Post 9 — Monday 7 September 2026, 17:19
  10. Post 10 — Thursday 3 September 2026, 10:00
  11. Post 11 — Tuesday 1 September 2026, 08:30
  12. Post 12 — Wednesday 26 August 2026, 13:54
  13. Post 13 — Monday 24 August 2026, 10:12
  14. Post 14 — Friday 21 August 2026, 08:54
  15. Post 15 — Thursday 20 August 2026, 10:58
  16. Post 16 — Wednesday 19 August 2026, 09:55
  17. Post 17 — Monday 17 August 2026, 13:42
  18. Post 18 — Monday 17 August 2026, 10:04
  19. Post 19 — Tuesday 4 August 2026, 13:03
  20. Post 20 — Monday 3 August 2026, 11:28
  21. Post 21 — Wednesday 29 July 2026, 15:00
  22. Post 22 — Wednesday 29 July 2026, 07:00
  23. Post 23 — Thursday 23 July 2026, 11:04
  24. Post 24 — Wednesday 22 July 2026, 11:59
  25. Post 25 — Monday 20 July 2026, 15:51
  26. Post 26 — Monday 20 July 2026, 10:12
  27. Post 27 — Thursday 16 July 2026, 10:33
  28. Post 28 — Wednesday 15 July 2026, 10:28
  29. Post 29 — Tuesday 14 July 2026, 12:45
  30. Post 30 — Monday 13 July 2026, 09:22
  31. Post 31 — Thursday 2 July 2026, 09:13
  32. Post 32 — Thursday 18 June 2026, 13:24
  33. Post 33 — Wednesday 17 June 2026, 08:30
  34. Post 34 — Monday 15 June 2026, 07:00
  35. Post 35 — Thursday 11 June 2026, 10:21
  36. Post 36 — Tuesday 9 June 2026, 09:14
  37. Post 37 — Wednesday 20 May 2026, 10:53
  38. Post 38 — Tuesday 19 May 2026, 10:04
  39. Post 39 — Thursday 14 May 2026, 16:56
  40. Post 40 — Wednesday 13 May 2026, 12:25
  41. Post 41 — Friday 8 May 2026, 07:34
  42. Post 42 — Tuesday 5 May 2026, 12:01
  43. Post 43 — Thursday 30 April 2026, 15:28
  44. Post 44 — Wednesday 22 April 2026, 15:42
  45. Post 45 — Monday 13 April 2026, 11:15
  46. Post 46 — Monday 13 April 2026, 10:00
  47. Post 47 — Early April 2026 (date estimated)
  48. Post 48 — Thursday 2 April 2026, 12:07
  49. Post 49 — Thursday 12 March 2026, 09:48
  50. Post 50 — Tuesday 24 February 2026, 10:36

Open the 148-page PDF

Conclusion

Fifty posts, eight months, one clear pattern.

Queensland Hydro's Facebook page is not a place where the Borumba project is explained, debated or justified. It is a place where the project is made to feel normal, local and friendly. Four out of every five posts are works updates, pop-up offices and consultation notices, or grants. The posts that do best are about contracts, business opportunities and old photos of the dam, not about energy, the environment or the creek. The single most popular post, with 163 reactions, is an invitation for local businesses to find out how to get contracts.

Works are called exploratory, interim, minor and temporary. Boreholes are the size of a takeaway coffee cup. Consultation is an informal chat and a chance to share your views. None of this tells you what is actually changing on Kabi country, and none of it offers the one thing that matters: our consent.

The silence is louder than the words. Not one of the 50 posts names the Kabi Kabi people. Not one names Traditional Owners. Cultural heritage gets one bullet point. Yabba Creek appears as a road. Asked directly, on that page, whether any lawful instrument authorises this project to override the rights of the Sovereign Kabi tribes, nobody replied. Of the 21 comment threads started across these posts, Queensland Hydro answered none. In the same comment sections it answered most questions about jobs, grants and project timing. Questions about the environment, when they were answered at all, got the same pasted statement again and again.

With about 2,300 followers, the typical post draws about 20 interactions, under 1% of the audience. Twenty of the 45 posts with recorded figures had no shares, and eight had no comments. Among the comments that can be seen, critical or worried voices outnumber supportive ones. Around a third of the comments Facebook counted could not be seen.

So what is Queensland Hydro really doing with its social media? It is building a record that it engaged and consulted. It is building goodwill with grants and nostalgia, and a base of support among people who want jobs and contracts. And it is doing this while works move onto our country, a workforce camp sits in the proposed upper reservoir area, and the people of this country are left out of the story entirely.

Kabi people have looked after Yabba Creek for longer than any record can show. We are not a stakeholder group to be managed or a heritage survey to be ticked off. We are the people of this country, and we say no.

Look past the friendly posts and ask the hard questions. Share this report. Ask Queensland Hydro why it will not name us. Ask why it will not answer us. Stand with us to protect Yabba Creek.

Let the valley breathe. Protect these sacred waters. #stopborumbahydro

— gilburri fahy, Sovereign Kabi Defence of Yabba Creek

Back to the register